Construction Update
East-West University Student Life Center

East-West University Student Life Center

East-West University’s new $35 million Student Life Center (825 South Wabash Avenue) continues to climb into the sky.  The building is clearly designed with the future in mind, as the bottom seven floors of its southern side has no windows in anticipation of the construction of another building in the lot next door.  The top ten floors are student housing.  It should be completed for the Fall, 2013 semester.

 

 

Editor

Author: Editor

Editor founded the Chicago Architecture Blog in 2003, after a long career in journalism. He can be reached at chicagoarchitectureinfo@gmail.com.

Share This Post On